Which target dates reach the places you operate in?
Every migration date the Atlas has recorded, by country, with what kind of date it is and how binding it is.
- As of 1 October 2026
- Reads 38 profile timelines
- the targets set by 4 guides
A target is not a legal deadline unless the instrument that sets it is binding. Each row says which, where the Atlas has recorded it.
Choose the places you operate in, and the earliest date among them appears here.
The places in this link could not be drawn here. The table below lists every date the Atlas has recorded, by country.
A target is not a legal deadline unless the instrument that sets it is binding. Each row says which, where the Atlas has recorded it.
Nothing ticked shows every date. Tick one or more to narrow the view.
No date the Atlas has recorded is set in law.
Until then, the table below lists every date the Atlas has recorded, by country.
Dates by year
Once you choose a place, its dates are listed here by year. The table below holds every date, by country.
Show as a table
| Date | Kind | What the date marks | Issuer | Scope | Status | Bindingness | Source |
|---|---|---|---|---|---|---|---|
| AustraliaNIST bloc | |||||||
| 2026 | not recorded | Transition plan in place | not recorded | not recorded | not recorded | Australia profile | |
| 2028 | not recorded | Migration underway | not recorded | not recorded | not recorded | Australia profile | |
| 2030 | not recorded | Traditional asymmetric cryptography ceased and migration complete | not recorded | not recorded | not recorded | Australia profile | |
| AustriaNo coordination posture recorded | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| BelgiumEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Belgium profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Belgium profile | |
| BrazilNIST bloc | |||||||
| 2026 | not recorded | ABIN lists the transition to post-quantum cryptography among its intelligence challenges | not recorded | not recorded | not recorded | Brazil profile | |
| 2026 | not recorded | ITI Normative Instruction 35 adds post-quantum algorithms to ICP-Brasil and the GOV.BR advanced signature | not recorded | not recorded | not recorded | Brazil profile | |
| BulgariaNo coordination posture recorded | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| CanadaNIST bloc | |||||||
| April 2026 | Plan | An initial departmental migration plan | Canadian Centre for Cyber Security | Written for directors and managers of IT systems in federal departments and agencies, and decision makers accountable for the migration, for non-classified systems only | Published | Guidance | Canadian roadmapGuide in Prepare |
| April 2026 | Other | Progress reports, every year from April 2026 | Canadian Centre for Cyber Security | Published | Guidance | Canadian roadmapGuide in Prepare | |
| 2026 | not recorded | Cryptographic modules in new procurements to support post-quantum cryptography for key establishment and digital signatures (Cyber Centre contract clauses ITSM.00.501) | not recorded | not recorded | not recorded | Canada profile | |
| December 2031 | Priority systems | Completing migration of high priority systems | Canadian Centre for Cyber Security | Published | Guidance | Canadian roadmapGuide in Prepare | |
| 2031 | not recorded | High-priority Government of Canada systems migrated to post-quantum cryptography | not recorded | not recorded | not recorded | Canada profile | |
| December 2035 | Completion | Completing migration of the remaining systems | Canadian Centre for Cyber Security | Published | Guidance | Canadian roadmapGuide in Prepare | |
| 2035 | not recorded | Remaining Government of Canada systems migrated to post-quantum cryptography | not recorded | not recorded | not recorded | Canada profile | |
| CroatiaEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Croatia profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Croatia profile | |
| CyprusEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Cyprus profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Cyprus profile | |
| CzechiaEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Czechia profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Czechia profile | |
| DenmarkEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Denmark profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Denmark profile | |
| EstoniaNo coordination posture recorded | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| European UnionEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Written for Member States in the first place and, with some adaptation, government organisations and other entities, including those that must comply with NIS2 | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Published | Soft law | EU roadmapGuide in Prepare | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Published | Soft law | EU roadmapGuide in Prepare | |
| FinlandEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2026 | not recorded | National cryptography working group requires quantum-safe KEM and signatures for products entering national evaluation; hybrid strongly recommended | not recorded | not recorded | not recorded | Finland profile | |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated (EU coordinated roadmap) | not recorded | not recorded | not recorded | Finland profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete (EU coordinated roadmap) | not recorded | not recorded | not recorded | Finland profile | |
| FranceEU coordinated | |||||||
| 2022 | not recorded | France 2030 'Cryptographie Post-Quantique' call for projects launched | not recorded | not recorded | not recorded | France profile | |
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | Procurement | No longer buying products without post-quantum cryptography | ANSSI | Written for public and private organisations (organisations publiques et privées) | Published | Guidance | ANSSI FAQGuide in Prepare |
| 2030 | not recorded | High-risk and sensitive use cases migrated (EU coordinated roadmap) | not recorded | not recorded | not recorded | France profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Migration of all systems complete (EU coordinated roadmap) | not recorded | not recorded | not recorded | France profile | |
| GermanyEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2026 | not recorded | Federal Government goal to initiate migration in security-critical areas | not recorded | not recorded | not recorded | Germany profile | |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | Highly sensitive applications: classical asymmetric encryption no longer used on its own; high-security applications migrated | not recorded | not recorded | not recorded | Germany profile | |
| 2031 | not recorded | Classical asymmetric encryption no longer used on its own | not recorded | not recorded | not recorded | Germany profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Classical signatures phased out | not recorded | not recorded | not recorded | Germany profile | |
| GreeceEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Greece profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Greece profile | |
| HungaryEU coordinated | |||||||
| 2025 | not recorded | Act LXIX of 2024 in force, binding post-quantum encryption obligations begin for designated organisations | not recorded | not recorded | not recorded | Hungary profile | |
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated (EU coordinated roadmap) | not recorded | not recorded | not recorded | Hungary profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete (EU coordinated roadmap) | not recorded | not recorded | not recorded | Hungary profile | |
| IndiaNIST bloc | |||||||
| 2029 | not recorded | Quantum resiliency of critical information infrastructure (DST Quantum-Safe Ecosystem report) | not recorded | not recorded | not recorded | India profile | |
| 2033 | not recorded | Enterprise-wide post-quantum cryptography adoption (DST Quantum-Safe Ecosystem report) | not recorded | not recorded | not recorded | India profile | |
| 2035 | not recorded | National quantum vision horizon with post-quantum cryptography transition plan for government systems (NITI Aayog roadmap) | not recorded | not recorded | not recorded | India profile | |
| IrelandEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Ireland profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Ireland profile | |
| IsraelNIST bloc | |||||||
| 2026 | not recorded | Banking corporations submit an initial post-quantum preparedness plan, within a year of the January 2025 Banking Supervision letter | not recorded | not recorded | not recorded | Israel profile | |
| ItalyEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Italy profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Italy profile | |
| JapanNIST bloc | |||||||
| 2026 | not recorded | Government post-quantum migration roadmap to be drawn up (FY2026) | not recorded | not recorded | not recorded | Japan profile | |
| 2035 | not recorded | Government and, as a rule, industry migration to post-quantum cryptography to be completed, adjusted by information criticality | not recorded | not recorded | not recorded | Japan profile | |
| LatviaEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Latvia profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Latvia profile | |
| LithuaniaEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2027 | not recorded | National plan: cryptographic inventory to be completed | not recorded | not recorded | not recorded | Lithuania profile | |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2031 | not recorded | National plan: post-quantum or hybrid cryptography in high-risk systems | not recorded | not recorded | not recorded | Lithuania profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2036 | not recorded | National plan: transition to post-quantum-only cryptography | not recorded | not recorded | not recorded | Lithuania profile | |
| LuxembourgEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | Critical and high-risk use cases migrated to post-quantum cryptography (EU deadline noted by ILNAS and NC3) | not recorded | not recorded | not recorded | Luxembourg profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| MaltaNo coordination posture recorded | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| NATONo coordination posture recorded | |||||||
| 2022 | not recorded | NATO describes Alliance work on post-quantum cryptography and quantum key distribution to secure communications against the quantum threat | not recorded | not recorded | not recorded | NATO profile | |
| 2024 | not recorded | NATO adopts its first Quantum Technologies Strategy (approved 2023), setting a quantum-safe end-state for Alliance cryptographic systems and committing Allies and NATO bodies to post-quantum cryptography and quantum key distribution | not recorded | not recorded | not recorded | NATO profile | |
| NetherlandsEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated (EU coordinated roadmap) | not recorded | not recorded | not recorded | Netherlands profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete (EU coordinated roadmap) | not recorded | not recorded | not recorded | Netherlands profile | |
| New ZealandNIST bloc | |||||||
| 2026 | not recorded | National Cyber Security Strategy commits GCSB to refresh its Cryptographic Products Management Infrastructure for a post-quantum world, within the 2026-2030 strategy period | not recorded | not recorded | not recorded | New Zealand profile | |
| NorwayNIST bloc | |||||||
| 2017 | not recorded | NSM thematic report on quantum-resistant cryptography sets out the quantum threat to public-key schemes | not recorded | not recorded | not recorded | Norway profile | |
| 2025 | not recorded | Finanstilsynet ROS 2025 recommends financial firms adopt quantum-safe encryption and related hardware | not recorded | not recorded | not recorded | Norway profile | |
| 2025 | not recorded | NSM Cryptographic Recommendations 2025 advise a cryptographic inventory, cryptographic agility and a plan to migrate to quantum-resistant cryptography as soon as possible | not recorded | not recorded | not recorded | Norway profile | |
| PolandEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2026 | not recorded | National Institute of Telecommunications (IL-PIB) begins a security assessment of post-quantum cryptography solutions (2026-2030 outlook) | not recorded | not recorded | not recorded | Poland profile | |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated (EU coordinated roadmap) | not recorded | not recorded | not recorded | Poland profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete (EU coordinated roadmap); national quantum-technology policy phases run to 2035 | not recorded | not recorded | not recorded | Poland profile | |
| PortugalEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Portugal profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Portugal profile | |
| RomaniaEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Romania profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Romania profile | |
| SingaporeNIST bloc | |||||||
| 2023 | not recorded | IMDA launches the National Quantum-Safe Network Plus, Southeast Asia's first quantum-safe network infrastructure | not recorded | not recorded | not recorded | Singapore profile | |
| 2025 | not recorded | CSA opens public consultation (23 Oct to 31 Dec 2025) on the Quantum-Safe Handbook, Quantum Readiness Index and draft Quantum-Safe Migration Handbook | not recorded | not recorded | not recorded | Singapore profile | |
| 2026 | not recorded | Singapore government states post-quantum cryptography will be the mainstream solution for quantum-safe migration (Committee of Supply 2026); IMDA issues a draft reference specification requiring post-quantum cryptographic techniques on the QKD module to key manager link | not recorded | not recorded | not recorded | Singapore profile | |
| SlovakiaNo coordination posture recorded | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| SloveniaEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated | not recorded | not recorded | not recorded | Slovenia profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete | not recorded | not recorded | not recorded | Slovenia profile | |
| South KoreaNIST bloc | |||||||
| 2025 | not recorded | Sector-by-sector PQC pilot transition support programme launched (energy, medical, public administration) | not recorded | not recorded | not recorded | South Korea profile | |
| 2026 | not recorded | Construction of a joint-certificate PKI infrastructure for the PQC transition, running through 30 November 2026 | not recorded | not recorded | not recorded | South Korea profile | |
| 2026 | not recorded | PQC pilot transition project extended to telecom, finance, transport, defence and space sectors, with a re-recruitment of participating companies | not recorded | not recorded | not recorded | South Korea profile | |
| SpainEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | High-risk use cases migrated (EU coordinated roadmap) | not recorded | not recorded | not recorded | Spain profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | Full migration of all systems complete (EU coordinated roadmap) | not recorded | not recorded | not recorded | Spain profile | |
| SwedenEU coordinated | |||||||
| December 2026 | Plan | The First Steps and the start of planning and pilots for high- and medium-risk use cases | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| December 2030 | Priority systems | Moving high-risk use cases, with quantum-safe software and firmware upgrades on by default | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2030 | not recorded | Information needing protection for ten years or more migrated to quantum-safe cryptography | not recorded | not recorded | not recorded | Sweden profile | |
| December 2035 | Completion | Moving medium-risk use cases, and as many low-risk ones as feasible | NIS Cooperation Group | Addressed to Member States | Published | Soft law | EU roadmapGuide in Prepare |
| 2035 | not recorded | General transition to quantum-safe cryptography completed | not recorded | not recorded | not recorded | Sweden profile | |
| SwitzerlandNo coordination posture recorded | |||||||
| 2025 | not recorded | NCSC (BACS) publishes the current technology brief on quantum computers and post-quantum cryptography, setting out the threat, the state of progress and where further action is needed (8 December 2025) | not recorded | not recorded | not recorded | Switzerland profile | |
| 2026 | not recorded | Armasuisse research programme begins analysing the e-ID technology stack and developing a demonstrator for a quantum-secure e-ID architecture | not recorded | not recorded | not recorded | Switzerland profile | |
| 2026 | not recorded | Federal administration public key infrastructure migration under way, moving certificates off RSA with changes to certificate algorithms and key lengths (BIT/FOITT) | not recorded | not recorded | not recorded | Switzerland profile | |
| 2029 | not recorded | Post-quantum cryptography research funds for the quantum-secure e-ID work allocated through to 2029 (armasuisse) | not recorded | not recorded | not recorded | Switzerland profile | |
| ThailandNIST bloc | |||||||
| 2026 | not recorded | Survey and risk assessment of the cryptographic estate | not recorded | not recorded | not recorded | Thailand profile | |
| 2027 | not recorded | Initial transition planning | not recorded | not recorded | not recorded | Thailand profile | |
| 2028 | not recorded | Migration of high-priority systems | not recorded | not recorded | not recorded | Thailand profile | |
| 2030 | not recorded | Plan refinement and review | not recorded | not recorded | not recorded | Thailand profile | |
| 2035 | not recorded | National transition to quantum-resistant cryptography complete | not recorded | not recorded | not recorded | Thailand profile | |
| United Arab EmiratesNIST bloc | |||||||
| 2025 | not recorded | National Encryption Policy and its executive regulation approved, mandating officially approved transition plans from traditional encryption to post-quantum cryptography | not recorded | not recorded | not recorded | United Arab Emirates profile | |
| 2026 | not recorded | Cyber Security Council signs agreement with the Advanced Technology Research Council to deploy and scale quantum-safe solutions across critical national infrastructure | not recorded | not recorded | not recorded | United Arab Emirates profile | |
| United KingdomNIST bloc | |||||||
| 2028 | Plan | Discovery and assessment, and an initial migration plan | National Cyber Security Centre | Written for technical decision-makers and risk owners, mainly in large organisations, operators of critical national infrastructure and companies that have bespoke IT | Published | Guidance | NCSC timelinesGuide in Prepare |
| 2028 | not recorded | Complete discovery of systems and services using cryptography | not recorded | not recorded | not recorded | United Kingdom profile | |
| 2031 | Priority systems | The highest-priority migration, and a refined plan | National Cyber Security Centre | Published | Guidance | NCSC timelinesGuide in Prepare | |
| 2031 | not recorded | Complete migration of highest-priority systems and services | not recorded | not recorded | not recorded | United Kingdom profile | |
| 2035 | Completion | Completing migration of all systems, services and products | National Cyber Security Centre | Published | Guidance | NCSC timelinesGuide in Prepare | |
| 2035 | not recorded | Complete migration of all systems, services and products | not recorded | not recorded | not recorded | United Kingdom profile | |
| VietnamSovereign | |||||||
| 2026 | not recorded | Government Cipher Committee tasked with building Vietnam's quantum-resistant cryptography development plan for 2026 to 2030 | not recorded | not recorded | not recorded | Vietnam profile | |
| 2026 | not recorded | VN-PQSign hash-based post-quantum signature launched (9 Feb 2026); draft TCVN national standard presented and joint Advanced Cryptography Research Lab opened | not recorded | not recorded | not recorded | Vietnam profile | |
| 2030 | not recorded | End of the 2026 to 2030 quantum-resistant cryptography development plan period | not recorded | not recorded | not recorded | Vietnam profile | |
About this view
- Sources
-
4 sources, by author then date
- ANSSI. (n.d.). FaQ sur la Cryptographie post-quantique (PQC). Retrieved October 1, 2026, from https://cyber.gouv.fr/enjeux-technologiques/cryptographie-post-quantique/faq-pqc/
- Canadian Centre for Cyber Security. (2025, June). Roadmap for the migration to post-quantum cryptography for the Government of Canada (ITSM.40.001). https://www.cyber.gc.ca/en/guidance/roadmap-migration-post-quantum-cryptography-government-canada-itsm40001
- National Cyber Security Centre. (2025, March 20). Timelines for migration to post-quantum cryptography. https://www.ncsc.gov.uk/guidance/pqc-migration-timelines
- NIS Cooperation Group. (2025, June 11). A Coordinated Implementation Roadmap for the Transition to Post-Quantum Cryptography, Part 1, Version 1.1. https://ec.europa.eu/newsroom/dae/redirection/document/117507
The migration timelines of 38 country profiles, each with its own sources on its profile page.
- As of
-
1 October 2026
- By
-
Swann Ashworth, CEPS
- Method
-
Each row is one line of a country profile's migration timeline, or one dated target of a guide the Atlas quotes: the guides a place issues itself and, for an EU Member State, the EU coordinated roadmap, which reaches it through membership and is drawn with an open marker. The kind of date and how binding it is come from the guide's own record or from an annotation checked against its source; where neither exists the row says not recorded, and nothing is inferred from a label, a posture or a year. Set in law means a binding instrument that is adopted or in force sets the date; set in guidance means published soft law or guidance does. A proposal, a withdrawn, repealed or superseded text, or a date whose status is not recorded, is filed under not recorded, so a proposal is never drawn as law.
The chart places a date at its month where the source names one, and in the middle of its year where the source gives only the year; dates before 2025 are drawn in the Earlier column and dates after 2036 in the Later column, and today is marked on the axis. The sentence above the chart names the earliest date from 2025 on, and earlier dates stay in the Earlier column and the table. Places are listed in alphabetical order, and nothing on this page ranks or scores them.
The timeline lines of the United States profile stay leads until they are re-read at their primary sources: preview builds draw them dotted, and the published view leaves them out.
- How to cite
-
Ashworth, S., & CEPS. (2026). Target dates. QSC Atlas, data as of 1 October 2026. https://www.qscatlas.app/target-dates Dataset archived at https://doi.org/10.5281/zenodo.21262284
- Corrections
- Report an error in this view